|
The
ABG Shipyard plans to make following changes in their layout to
increase the ship building capacity.
- The
area available north of Shed Number 1 shall be used as an additional
covered fabrication shed.
- Shed
no 3 which is being used for aluminium vessel construction shall
be used for housing the CNC, shearing, rolling, bending, pressing
machines. This shift shall provide block making facilities on
both sides of this shed. Thus improving the material flow.
-
Construction of 1 additional Dolphin Jetty.
- A
new covered shed next to main dry dock area for construction of
Aluminum vessels.
|